Vol. | No. | Year | Article Title |
---|---|---|---|
40 |
e-Edition 1 |
2004 |
Subjectivity
in Hazard Analysis by Felix Redmill |
40 |
e-Edition 1 |
2004 |
A Review of Risk Analysis Tools Successful in Project Management by Paul S. Ray, Surya Prasanna Kumar Chodimella, Balaji Pattabiraman and Ramji Srinivasan |
40 | 2 | 2004 |
Establishing and Auditing Measures for Hazardous Energy Isolation
by Scott Gunderson |
40 | 3 | 2004 |
Theory and Methods for Calculating Probability of Hazardous Events
by Vito Faraci |
40 | 3 | 2004 |
Truck Engines, Space Shuttle Thrusters and Common Cause Failure Probability Determination
by Sergio Oliva, ASP |
40 | 3 | 2004 |
Safety Strategies in Living Organisms
by Stuart Burgess |
40 | e-Edition 4 | 2004 |
Failure Modes of the F-1 Rocket Engine System
by Paul S. Ray, Ph.D., PE, CSP, C. Eng. (U.K.) |
40 |
e-Edition 4 |
2004 |
Return to Sender: System Maintenance, Reverse Logistics, and Hazardous Materials Transportation
by Scott Gunderson |
40 | 5 | 2004 |
Truck Engines, Space Shuttle Thrusters and Common Cause Failure Probability Determination — Revisited
by Sergio Oliva, ASP |
40 | 5 | 2004 |
Fire Risk Analysis on Retailing Areas of a New Airport Terminal
by W.K. Chow and Candy M.Y. Ng |
40 | 6 | 2004 |
A Model for Selecting Risk Assessment Tools for a Project
by Paul S. Ray, Ph.D., PE, CSP, C. Eng. (U.K.); Ramji Srinivasan; Thomas W. Merritt, Ph.D., PE; and Phillip A. Bishop, Ed.D |
40 | 6 | 2004 |
Design Safety Compromises
by George A. Peters and Barbara J. Peters |